Department of Energy Project Pine Ridge Middle School Naples, FL
TRANE 130 TON CHILLER SYSTEM | TONS COOLING PRODUCED @ 5GPM (@ MFG. PUBLISHED FLOW OF 120GPM)
| KWH LOAD PRODUCED IN 15 MINUTES @ 5GPM | BLENDED AMPERAGE LOAD @ TIME OF ANALYSIS | APPROXIMATE WATT LOAD @ TIME OF ANALYSIS | EQUIPMENT CASING SURFACE TEMP @ TIME OF ANALYSIS | | Untreated | 1.41 (34.8) | 1.57 | 93 | 42,780 | 170 | | Treated | 1.69 (40.56) | 1.45 | 62 | 28,520 | 150 | | Difference | 16.56% | -7.64% | -33.33% | -33.33% | -11.76% |
 With treatment Without treatment LOAD 0.85 KWH/TON LOAD 1.11 KWH/TON
 Alexander E. Othmer CEA/CBA/NDE III Mgr. Florida Energy Offices Energy Conservation Assistance Program Small Business Development Center University Of South Florida
|